According to a post from the City of Burlington WI, tarps are currently being placed on the standpipe to provide protection while the exterior sandblasting and painting is conducted. The standpipe was originally constructed in 1978, and the upgrade is expected to be completed in November.
top of page
bottom of page
Comments