• Doorway created for collaboration between Metals & Woods
• Electrical & Air drops installed in TechEd shops
• Concrete floorings being poured in SR/JR High School Team Rooms and TechEd additions
• Load bearing support beams are being installed in the wrestling room
• Phase 1 Capital Maintenance roofing project is completed on the SR/JR High School
• 90% of concrete walls are now installed on the Auxiliary Gym