According to an update from the Wisconsin Department of Transportation, crews are currently removing the existing soil beneath the old roadbed of US 14/Humes Rd. in Janesville. Once at sub-grade, geo-grid is placed to stabilize the underlying soils. Recycled pavements are used to construct the future roadbed. For more information on the project, visit https://projects.511wi.gov/us14-janesville/.
top of page
bottom of page
Comments